精品福利一区二区三区-欧美日韩在线二区三区-超碰亚洲国产日本看片免费-成熟女人性生活免费视频

Aluminum alloy heat treatment and quenching process

Date:2020-05-27

Aluminum alloy heat treatment and quenching process

1、Aluminum alloy heat treatment process。

The purpose of this process is to make a large amount of hardening elements that can be used, such as copper, magnesium, zinc, or polydissolved solids, into a solid melt, which must be kept at a high temperature of 535 degrees to 550 degrees for a long enough time. 8 hours, and obtain a more homogeneous solid solution. 1. Aluminum alloy solid solution temperature, aluminum alloy rim solid solution state point is 530 degrees, the melting point is 555 degrees, beyond this temperature begins to melt into aluminum water。

Main points of aluminum alloy heat treatment process:

A.When warming up, first turn on the windmill cooling water first, then turn on the windmill fully to set the operating temperature and combustion status

When entering the furnace (the casting is placed with the A side facing up, and the A side is forbidden (during solution treatment))

B.Solid solution aging treatment conditions 545 degrees * 8H + 130 degrees * 6H The temperature must be stable and uniform, according to the design strength of the rim、

Material, characteristics, testing decision。

C.The quenching water temperature is 60 degrees-80 degrees water temperature, the casting is not easy to deform, and the quenching time is counted from the door to

The uppermost casting is fully soaked in water, and the time is 16 seconds to 20 seconds to complete the instant quenching water。

D.Full inspection items after solution treatment, deformation inspection, reshaping, steel characters to prevent abnormal quality tracking, every time after aging

The hardness of one casting is measured on the upper and lower layers of the trolley, the value is 65-75HB. Cooperating with continuous automatic operation is the same as high temperature operation, enter the furnace after the furnace is pre-fired, and enter and exit the furnace regularly according to the time set by the timer。

2、Delaying process of aluminum alloy quenching water。

When quenching water, the casting is taken from the solution temperature in the furnace to the quenching water. The time it takes is the delay of quenching water. The delay of quenching water is 15 seconds> 18 seconds. The most commonly used quenching liquid is water, and the rest is air or liquid nitrogen, etc., but the stress and distortion caused by quenching should be considered. Sometimes hot water is needed to prevent deformation and cracking. 5. Precipitation hardening When heat-treatable aluminum alloy is quenched to normal temperature, due to the low solubility of solute at low temperature, it produces a saturated and unstable state, so some tissues will precipitate in the base, and the precipitation effect at room temperature is Natural aging, if it needs to be heated to a certain temperature, the precipitation is artificial aging。


分享
×
日韩一级毛一欧美一级乱| 成人日韩视频中文字幕| 中文字幕日韩欧美一区| 99久久精品午夜一区二| 我的性感妹妹在线观看| 亚洲中文字幕视频在线播放| 中文字幕人妻av不卡| 欧美日韩久久精品一区二区| 国产一级性生活录像片| 美女黄色三级深夜福利| 亚洲欧美日韩色图七区| 国产亚洲不卡一区二区| 国产精品久久久久久久久久久痴汉 | 精品人妻一区二区四区| 国产精品熟女在线视频| 精品久久少妇激情视频| 开心五月激情综合婷婷色| 国产精品成人一区二区在线| 久久国内午夜福利直播| 欧美日韩高清不卡在线播放| 麻豆蜜桃星空传媒在线观看| 白白操白白在线免费观看| 欧美不卡午夜中文字幕| 亚洲国产av在线观看一区| 麻豆印象传媒在线观看| 亚洲天堂精品一区二区| 亚洲欧美日韩国产自拍| 国产精品丝袜一二三区| 精品一区二区三区不卡少妇av| 免费在线播放一区二区| 日韩免费午夜福利视频| 国产高清三级视频在线观看| 午夜久久精品福利视频| 亚洲欧美日本国产不卡| 在线懂色一区二区三区精品| 91日韩欧美在线视频| 天堂网中文字幕在线观看| 五月婷婷综合缴情六月| 亚洲日本加勒比在线播放| 男人和女人干逼的视频| 精品人妻一区二区三区免费|